Today was a successful day. It took us a little longer than expected to do what we wanted, but the rain held out. Today, we loaded up the first of three trucks (otherwise known as Truck 3). All the walls above 8 feet, the ceilings, the back deck(east side), the batteries and the inverter cabinet are all on this truck. The only things remaining are the modules and the front deck (west side).
Nothing left but the bones
September 24, 2007 by
Recent Comments